Steel warehouse and prefabricated house manufacturer
Search
Home

Search

Search

  • Requirements for Steel Structure Building Construction
    • 2025-10-04

    Fabrication Phase Requirements This phase transforms the design into ready-to-erect components. Quality Control (QC) in the Shop: Cutting and Drilling: Must be precise according to shop drawings. Holes for bolts must be accurately aligned. Fit-Up: Members must be trial-fitted before welding to ensure proper alignment and gaps. Welding: Must be performed by certified welders following Qualified Wel...

© Copyright: 2025 Hebei Baofeng Steel Structure CO.,LTD All Rights Reserved.

IPv6 network supported

top

Leave A Message

Leave A Message

    If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.