Fabrication Phase Requirements This phase transforms the design into ready-to-erect components. Quality Control (QC) in the Shop: Cutting and Drilling: Must be precise according to shop drawings. Holes for bolts must be accurately aligned. Fit-Up: Members must be trial-fitted before welding to ensure proper alignment and gaps. Welding: Must be performed by certified welders following Qualified Wel...
Key Advantages of Steel Structures for Manufacturing: 1. Speed of Construction Prefabrication: The components (beams, columns, trusses) are manufactured off-site in a controlled factory environment. This allows for precise engineering and simultaneous site preparation (grading, foundations). Rapid Assembly: Once delivered, the pre-engineered steel components are bolted together on-site like a gian...