Steel warehouse and prefabricated house manufacturer
Products
Home

Warehouse and Workshop

Two-story steel structure garment factory design

Two-story steel structure garment factory design

Size:43m x 99.5m x 8m

Area: 3466sqm

  • Item No.:

    Gg-55
  • Payment:

    T/T & L/C
  • Product origin:

    Hebei, China
  • Shipping port:

    Tianjin
  • Lead Time:

    about 30 days
  • Price:

    30-50 usd/sqm
  • Product Details

The project consists of two parts: one is a two-story office building, and the other is a production workshop on the first floor. The size of the second-story office building is: 7m x 22.5m x 8m;

The workshop and office building are paved with 1-meter-high brick walls;

During the design process of the workshop, no crane was used.

The maintenance board is EPS composite board, the top board is blue, and the wall board is white;

Supplied windows and dimensions:

The size of the windows in the office building is 1.2m x 1.5m;

The steel structure workshop has strip windows and sliding windows;

Supplieddoors and size:

There is a door at the entrance of the office building, the size is 2m x 2m;

There are 2 sliding doors on the side of the warehouse, the size is 4m x 4.5m;

Somalia Shopping Center


Our steel structure has a wide range of uses. In addition to shopping malls, it can also be used as warehouses, workshops, production workshops, office buildings, exhibition halls, etc. As long as you have any needs, please feel free to contact us.We have professional designers who can provide you with free design solutions according to your requirements. 



Steel structure production process


Our company has just optimized the product production line, adopted advanced production machines, simplified the production process, improved production efficiency, and will never delay the construction period under the condition of quality and quantity.


1. Production of main steel components

Using automated equipment, the steel plate is cut into main steel components, with an error of ±2mm;


2. Production ofsmall piece 

The automatic machine automatically aligns the plate for drilling, the deviation is less than or equal to 1mm, to ensure 100% installation without error


3. Assembling, submerged arc welding, straightening of section steel

Combine the three processes of assembly, submerged arc welding and correction to improve production efficiency, and the finished product error is ±2mm


4. All component numbers

All components are numbered, marked with numerical values and letters, which saves time for later production processes and improves production efficiency.


5. Cut the marked section steel

This step is to cut the marked section steel, using infrared scanning, the error range is within 2mm, the cutting edge is smooth and beautiful, which is convenient for later welding.


6. Assemble

Assemble all the connection boards and perform local spot welding with electric welding; check the dimensions to ensure that the dimensions of each component conform to the drawings.


7. Secondary welding

Weld all the connecting parts of the assembly process firmly, and cross the assembly process, with high productivity and fast welding efficiency.


8. Shot blasting and rust removal

Through the impact and cutting action of the spraying material on the profiled steel, the surface rust of the profiled steel is removed to increase the roughness, and artificial slag removal treatment is also performed, which makes a very good preparation for the spray painting, enhances the adhesion of the coating and the profiled steel, and prolongs the Durability of the coating film.


9. Spray paint

Spray paint according to the drawings and customer requirements, and spray 4 times. After the completion, the surface of the component will not sag, no bubbles, no cracks, and the color is uniform and beautiful.


10. Composite board veneer production

On average, each machine can produce 2,000 square meters a day; veneer production machines: we have 6 machines, which can produce 10,000 meters a day.


11.C section steel production

CNC C-shaped steel production machine, first punching, then bending, and then cutting, no burrs and no sticking, high production efficiency, can produce 5,000 meters a day.


12.Accessories production


FAQ


Q1: You are a manufacturing factory or a trading company?
A: We are the direct manufacture of steel structure buildings. we have rich experience in steel structure designing, manufacturing, processing, and installation.

Q2: Is your price competitive with other companies?
A: Our business goal is to give you the best price with the same quality and the best quality with the same price. We will try our best to reduce your cost.

Q3: Do you offer service for installation?
A: We will give detailed installation drawings and videos for free. And if you need, we could send engineers as installation directors even a team.

Q4: Do you accept container loading inspection?
A: You are welcomed to send an inspector, not only for the container loading but any time during the production time.

Q5: Do you offer designing service for us?
A: Yes, we have an experienced design team, and we can design full solution drawings according to your requirements.

Q6: What is the delivery time?
A: Delivery time depends on order quantities. Generally, the delivery time will be 30 days after receiving the deposit.

Q7: How can you get a quotation for your projects?
A: You can chat with us anytime or you can just fill out our questionnaire and send it back to us. We will give you the best quotation asap.



Leave A Message

If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.

related products
steel structure storage warehouse manufacturer
Prefabricated light steel structure storage warehouse buildings

Direct manufacturer for steel frame warehouse

prefabricated steel structure workshop
Large span weld H beam prefabricated steel structure workshop

customized steel workshop construction building

light metal frame building design
Light metal frame building prefab welded steel material structure workshop

prefabricated galvanized steel structure production workshop

construction steel material warehouse
Modern prefabricated construction steel structure material warehouse

prefab warehouse steel structure warehouse industrial steel structure

steel logistics warehouse
Somalia steel logistics warehouse project

Size: 26mx50mx8m Area: 1300sqm

steel warehouse
Prefab Steel Structure Warehouse

large span prefab steel structure warehouse buildings

steel structure warehouse
Steel warehouse building storage sheds house

Metal steel structure frame building manufacturer

Steel warehouse
Prefabricated construction steel warehouse

Steel warehouse building from China

© Copyright: 2024 Hebei Baofeng Steel Structure CO.,LTD All Rights Reserved.

IPv6 network supported

top

Leave A Message

Leave A Message

    If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.