large span prefab steel structure warehouse buildings
Item No.:
Gg-36Payment:
T/T & L/CProduct origin:
Hebei, ChinaShipping port:
TianjinLead Time:
about 30 daysPrice:
30-50 usd/sqmProduct Description
There are many types of industrial buildings, which can be divided into machinery workshop buildings, precision instrument workshop buildings, aviation factory buildings, shipyard buildings, cement factory buildings, chemical factory buildings, textile factory buildings, thermal power plant buildings, hydroelectric power station buildings, and nuclear power plant buildings and so on.
Steel structure production process
Our company has just optimized the product production line, adopted advanced production machines, simplified the production process, improved production efficiency, and will never delay the construction period under the condition of quality and quantity.
1. Production of main steel components
Using automated equipment, the steel plate is cut into main steel components, with an error of ±2mm;
2. Production ofsmall piece
The automatic machine automatically aligns the plate for drilling, the deviation is less than or equal to 1mm, to ensure 100% installation without error
3. Assembling, submerged arc welding, straightening of section steel
Combine the three processes of assembly, submerged arc welding and correction to improve production efficiency, and the finished product error is ±2mm
4. All component numbers
All components are numbered, marked with numerical values and letters, which saves time for later production processes and improves production efficiency.
5. Cut the marked section steel
This step is to cut the marked section steel, using infrared scanning, the error range is within 2mm, the cutting edge is smooth and beautiful, which is convenient for later welding.
6. Assemble
Assemble all the connection boards and perform local spot welding with electric welding; check the dimensions to ensure that the dimensions of each component conform to the drawings.
7. Secondary welding
Weld all the connecting parts of the assembly process firmly, and cross the assembly process, with high productivity and fast welding efficiency.
8. Shot blasting and rust removal
Through the impact and cutting action of the spraying material on the profiled steel, the surface rust of the profiled steel is removed to increase the roughness, and artificial slag removal treatment is also performed, which makes a very good preparation for the spray painting, enhances the adhesion of the coating and the profiled steel, and prolongs the Durability of the coating film.
9. Spray paint
Spray paint according to the drawings and customer requirements, and spray 4 times. After the completion, the surface of the component will not sag, no bubbles, no cracks, and the color is uniform and beautiful.
10. Composite board veneer production
On average, each machine can produce 2,000 square meters a day; veneer production machines: we have 6 machines, which can produce 10,000 meters a day.
11.C section steel production
CNC C-shaped steel production machine, first punching, then bending, and then cutting, no burrs and no sticking, high production efficiency, can produce 5,000 meters a day.
12.Accessories production
This is our accessory production area, all accessories for the entire project are produced here
13. Freight Yard
All produced goods will be packed, boxed and shipped here
Then, you can wait to receive your shipment.
If your steel structure project needs to be constructed, please feel free to contact us, we will design the best solution for you according to your project needs, and give you the best quotation.