Steel warehouse and prefabricated house manufacturer
Products
Home

Warehouse and Workshop

Large span weld H beam prefabricated steel structure workshop

Large span weld H beam prefabricated steel structure workshop

customized steel workshop construction building


  • Item No.:

    Gg-30
  • Payment:

    T/T & L/C
  • Product origin:

    Hebei, China
  • Shipping port:

    Tianjin
  • Lead Time:

    30-45 days
  • Price:

    30-50 usd/sqm
  • Product Details


Product specifications

Steel structure buildingis made of the main framework with H beam, C purlin or Z purlin. Roof and wall use variety of panels together with other components such as windows and doors. Steel structure building has the advantages of wide span, high strength, light weight, low cost, temperature protection, save energy,beautiful appearance, short construction time, good effect of insulation, long using life, space efficient, good seismic performance, flexible layout, etc.


Steel structure production process

Our company has just optimized the product production line, adopted advanced production machines, simplified the production process, improved production efficiency, and will never delay the construction period under the condition of quality and quantity.

 

1. According to the drawings, cut the steel plate into main steel components

  Machine: CNC flame cutting machine

  Advantages: automated equipment, accurate cutting, error±2mm; high production efficiency, can cut 150-200 tons of plates a day.


2. Small piece production

  Machine: CNC Drilling Machine

  Advantages: By programming the XYZ axis limit function, the machine automatically aligns the plate for drilling, fast speed, high precision, deviation≤1mm, ensuring 100% installation error-free.


3. Assembling of section steel, submerged arc welding, straightening

  Machine: Straightening, grouping and welding machine

  Advantages: This machine integrates the three processes of assembly, submerged arc welding and correction. Two machines form an assembly line to work. The error of the finished product is +-2mm, and the output of the finished product is about 25 meters per hour, which greatly improves the production efficiency.


4. Number all components

  Machine: Shaped steel intelligent marking robot

  Advantages: This machine adopts the special marking plasma power source of Hypertherm to mark the welding lines, component numbers, values and letters on all components. It saves time for the later production process and greatly improves the work efficiency and production capacity.

 


5. Cut the marked section steel

  Machine: steel cutting robot

  Infrared scanning is adopted, the error range is within 2mm, and the TEKAL software data file cutting is deepened through detailed drawings. It supports various overlapping forms of bevels, Z-shaped mouth cutting, and the cutting mouth is smooth and beautiful, which is convenient for later welding. Eliminate the tedious process of artificial incision and post-grinding. The cutting efficiency is fast, and the output can reach up to 50T/day.


6.Assemble

 The assembly of all connecting boards is completed in this process; electric welding is performed for local spot welding; the dimensions are checked to ensure that the dimensions of each component conform to the drawings.


7. Secondary welding

The second welding process will weld all the connecting parts of the assembly process firmly. The advantages are: the cross-operation with the assembly process has high productivity, and the welding efficiency is fast. After all the tests are qualified, the next process is entered.


8. Shot blasting and rust removal

This process is mainly through the impact and cutting action of the spraying material on the section steel, to remove the surface rust of the section steel and increase the roughness, and also to do artificial slag cleaning, which makes a very good preparation for the spray painting, and enhances the coating and section steel. Adhesion, extending the durability of the coating film.


9. Spray paint

Spray paint according to the drawings and customer requirements, and spray 4 times: 2 times of Hongdan anti-rust primer (anti-rust), 2 times of medium gray alkyd topcoat (waterproof); coating thickness: more than 70um, allowable deviation 5um; completed After cleaning, the surface of the component does not sag, no bubbles, no cracks, and the color is uniform and beautiful.


10. Composite board veneer production

Composite board production machine: can produce 2000 square meters a day; veneer production machine: we have 6 machines, which can produce 10000 meters a day.


11. C section steel production

CNC C-section steel production machine, CNC programming to set the hole spacing/length, punching first, then bending, and then cutting, no burrs and no sticking, high production efficiency, can produce 5000 meters a day.


12. Accessories production

This is our accessory production area, all accessories for the entire project are produced here.


13. Freight Yard

  All produced goods will be packed, boxed and shipped here.


Then, you can wait to receive your shipment.

If your steel structure project needs to be constructed, please feel free to contact us, we will design the best solution for you according to your project needs, and give you the best quotation.


FAQ

Q1: You are manufacture factory or trading company?
A: We are direct manufacture for steel structure buildings. we have rich experiance of steel structure designing,manufacturing, processing and installation.
Q2: Is your price competitive with other companies?
A: Our business goal is to give you the best price with same quality and best quality with the same price. We will try our best to reduce your cost.
Q3: Do you offer service for installation?
A: We will give detailed installation drawings and video for free. And if you need, we could send engineers as installation director even a team.
Q4: Do you accept container loading inspection?
A: You are welcomed to send an inspector, not only for the container loading, but any time during the production time.
Q5: Do you offer designing service for us?
A: Yes, we have experienced design team,and we can design full solution drawings as your requirements.
Q6: What is the delivery time?
A: Delivery time depends on order quantities. Generally, the delivery time will be 30 days after receiving deposit.
Q7: How can you get a quotation for your projects?
A: You can chat with us anytime or you can just fill out our questionnaire and send back to us. We will give you the best quotation asap.









Leave A Message

If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.

related products
steel structure storage warehouse manufacturer
Prefabricated light steel structure storage warehouse buildings

Direct manufacturer for steel frame warehouse

prefabricated steel structure workshop
Large span weld H beam prefabricated steel structure workshop

customized steel workshop construction building

light metal frame building design
Light metal frame building prefab welded steel material structure workshop

prefabricated galvanized steel structure production workshop

construction steel material warehouse
Modern prefabricated construction steel structure material warehouse

prefab warehouse steel structure warehouse industrial steel structure

steel logistics warehouse
Somalia steel logistics warehouse project

Size: 26mx50mx8m Area: 1300sqm

steel warehouse
Prefab Steel Structure Warehouse

large span prefab steel structure warehouse buildings

Steel warehouse
Prefabricated construction steel warehouse

Steel warehouse building from China

Prefab warehouse buildigns
Prefab warehouse project steel structure buildings

Multifunctional steel structure building

© Copyright: 2022 Hebei Baofeng Steel Structure CO.,LTD All Rights Reserved.

IPv6 network supported

top

Leave A Message

Leave A Message

    If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.